Send As SMS

Tuesday, July 25, 2006

News Update...

Road Status:
So, nothing much new with the current status of the roads. No new openings of roads or anything.

Investigation Status:
Mostly mum at this point, on the I-90 connector but some bad news about the Ted Williams Tunnel.
  • Latest news ... 6/25 - Ted Williams Tunnel: More bad bolts , this time on the Westbound entrance to the Ted Williams Tunnel - 3 bad bolts, one 1/2 an inch. (Globe)
  • Ted Williams Tunnel Herald Bombshell: Technician witnessed bolt failures and took pictures - Installers improperly installed the epoxy bolts. Incorrect methods still used even after being reprimanded. A new name to add to list: Walsh Construction Company
  • Ted Williams Tunnel Mistakes - Bolts kept in place with duct tape (holds the universe together afterall) due to mistakes in prep work (holes too deep, bolts too short, epoxy not mixed properly). Walsh complained about voids in the ceiling concrete. Could this be because we have bad concrete?
Political Scene:
However, the political scene is heating up.

Will update the links soon for all the players.

0 Comments:

Post a Comment

<< Home